|

The Milling Period: Mike Webster talks about his plans for a 2008 launch of the U-28 Unlimited Hydroplane... a turbine update of the old U-3 Master Tire.


NOTE: I was having audio problems with some of the video shot in Evansville, so I posted it here instead of directly at HydroInsider.com. It's still a little low for the interview, but I can listen to it.




0 comments: